Energy storage module & PACK line
Start with the module drawing, pack architecture and required process scope.
FROM CELL FORMAT TO FACTORY SCOPE
Compare Huiyao module and PACK assembly routes for energy storage and EV projects. Start with your cell format, then bring your drawings, output target and factory constraints into the discussion.

Start with product access, fixtures and the boundary between operator and equipment.
Review your brief ↓Existing workshop + AI art direction. Highlights explain spaces, not equipment motion or confirmed capabilities.
02 / WHAT YOU BUILD
Choose a format to focus the routes below.
Final compatibility requires an engineering review.
5 assembly routes
Start with the module drawing, pack architecture and required process scope.
Discuss manual and automated work boundaries before specifying equipment.
Review cell geometry, handling, fixturing and project-specific compatibility.
Define cell format, interconnection design and module assembly requirements.
Discuss cell handling, tab connections and the required module structure.
FROM ROUTE SELECTION TO A LINE PROPOSAL
Two projects using the same cell format can need different handling, joining, inspection and operator tasks. Use the routes above as a starting point for discussion, not a confirmed equipment configuration.
State whether you need a new line, an expansion or a defined station upgrade. Equipment scope and performance are confirmed through engineering review.
Compare system boundaries and interfaces03 / WHAT THE LINE MUST DO
A conversation map, not a fixed machine sequence.
Select a stage to see what should be agreed.
Agree what enters the line, how it is identified and which incoming checks belong in the supplied equipment.
Equipment, tests and interfaces are project-specific. A selected stage does not confirm it is included in a quotation.
04 / WHAT WE NEED TO DISCUSS
Use these inputs to start an engineering discussion. Your selections stay in this browser tab. Copy your outline, open the inquiry form and paste it into the project notes.
Also prepare: cell and module drawings, throughput with unit and shift basis, site layout, utilities and destination country.
Nothing is submitted. Copy the brief and paste it into your inquiry.
Open the inquiry formPaste your copied brief into the form’s project notes. Your selections are not transferred automatically. You will review your details and submit on the inquiry form.
AI VISUAL INTERPRETATION